Jump/Battery Booster 1.5 Meter Lead
 
Leads manufactured in 400 strand copper cable giving maximum conductivity of power
 
 
Please state at the checkout on notes whether you require a positive or Negative Clamp/Lead

Genuine 1.5M Long Leads For Portable Power 1700 & Snap On PORPR1700

£79.00Price
Sales Tax Included